All rough plumbing has been covered with quarter minus and wrapped and has passed inspection. After passing inspection, pipes have been covered and now the pad is being cleared of excess dirt and ready for slab pour which included compacting the dirt and covering with AB. Pad should be ready for inspection next week with the slab pour to follow.