Week 16 – Framing Continues

October 4, 2025 by sivarajan home

Framing has come a long way in the last week. Trusses are expected this next week.

20251003_082842
20251003_082952
20251003_083024
20251003_083029
previous arrow
next arrow

Filed Under: sivarajan home build

Week 15 – Framing Started

September 30, 2025 by sivarajan home

Framing of the house has started. The goal is to have the majority of the structure framed by the end of the week.

20250929_081123
20250929_081102
20250929_081250
20250929_081321
previous arrow
next arrow

Filed Under: sivarajan home build

Week 14 – Pad Poured and Ready for Framing

September 24, 2025 by sivarajan home

Foundation pad has been poured and is ready for framing. Framing will start as soon as the lumber is dropped on Wednesday or Thursday of the week of 09-22-2025 (or this week).

1346919935152395904
20250922_090214
20250922_090151
20250922_090625
previous arrow
next arrow

Filed Under: sivarajan home build

Week 11-13 – Covering / Wrapping Pipes and Clearing Pad for Pour

September 13, 2025 by sivarajan home

All rough plumbing has been covered with quarter minus and wrapped and has passed inspection. After passing inspection, pipes have been covered and now the pad is being cleared of excess dirt and ready for slab pour which included compacting the dirt and covering with AB. Pad should be ready for inspection next week with the slab pour to follow.

20250912_080114
20250912_080041
20250912_081152
20250912_080830
previous arrow
next arrow

Filed Under: sivarajan home build

Week 9&10 – Filling Stem Walls

August 17, 2025 by sivarajan home

Inspection for stem walls passed and walls have been grouted. Rough plumbing has passed inspection. Shading over plumbing inspection is next. Then lot will be leveled and ab will be added and compacted making it ready for foundation and footing pour.

20250815_082056
20250815_082037
20250814_073158
20250815_082218
previous arrow
next arrow

Filed Under: Uncategorized

Week 8 – Block for Stem Walls

August 5, 2025 by sivarajan home

Block for stems walls have been added with inspection shortly.

20250805_074836
-7790364327067354182
-4941021636519334926 (1)
20250805_074708
20250805_074647
previous arrow
next arrow

Filed Under: sivarajan home build

Week 7 – Block Stem Walls

July 28, 2025 by sivarajan home

Footing stem walls being built. Once steel has been place they can be inspected and then grouted prior to slab pour.

7926106559688683797
1620604830410295228
-1016003746522296271
previous arrow
next arrow

Filed Under: sivarajan home build

Week 6 – Pouring the Footings

July 20, 2025 by sivarajan home

After 2-3 weeks of very hard digging in hardpan, the footings for the house foundation and walls were poured this week.

2601638494907571101
-2810821855945165845
6825150844337132256
7105249311785559384
previous arrow
next arrow

Filed Under: sivarajan home build

  • « Go to Previous Page
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Go to Next Page »

Copyright 2025 - Sivarajan Home