Week 24 – Trusses Almost Completed

November 29, 2025 by sivarajan home

Trusses arrived on Wednesday and by Friday were almost completed. Should be totally completed by early next week. Staircases from lower floor to upper floor have also been added.

20251128_093412
20251128_093619
20251128_093656
20251128_094045
20251128_094347
previous arrow
next arrow

Filed Under: sivarajan home build

Week 23 – Ready for Trusses

November 22, 2025 by sivarajan home

This week’s post deserved two posts; one for the overall construction and one for the views. The views are gorgeous and are from just about every room. Framing is ready for trusses and trusses are scheduled to be delivered the day before Thanksgiving.

20251120_091705
20251120_091745
20251120_091826
20251120_092138
20251120_091614
20251120_091536
previous arrow
next arrow

Here are some of the views from the upstairs level. Unlike the above slideshow, this set of photos is not on auto scroll so you can just click the arrow to scroll through the images.

20251120_092504
20251120_092531
20251120_092609
20251120_093053
previous arrow
next arrow

Filed Under: sivarajan home build

Week 22 – Second Story Framing

November 16, 2025 by sivarajan home

Second story framing is almost complete and ready for trusses. Trusses should be ready in the next week or 10 days. Rain during this week will slow things down a bit, but the project is moving at a steady pace with no major issues. Dumpster was ordered and lot has been cleaned of excess debris.

20251114_094811
20251114_094136
20251114_094201
20251114_094301
20251114_094344
previous arrow
next arrow

Filed Under: sivarajan home build

Week 21 – Floor Trusses, Floors & Second Story Walls

November 7, 2025 by sivarajan home

Floor trusses were delivered at the end of week 20 so week 21 started with adding the second-story floor trusses, second story flooring and second story walls. Block work continued thoughout week. Additional lumber was also dropped. Should be ready for roof trusses next week as long as the trusses are ready.

20251103_102502
20251103_102800
20251107_085302
20251107_085732
20251107_085711
20251107_085816
20251107_090041
previous arrow
next arrow

Filed Under: sivarajan home build

Week 20 – Block Walls and Trusses

November 2, 2025 by sivarajan home

Trusses have been delivered and block wall almost complete and ready for inspection. Trusses will start being placed this next week.

20251031_100904
1000001258
1000001257
previous arrow
next arrow

Filed Under: sivarajan home build

Week 19 – Completing Block Walls

October 25, 2025 by sivarajan home

Block walls are being completed. Block wall inspection for grout next week. Trusses have been certified by engineer and are now being built. Should be onsite in the next week or two.

20251024_102058
20251024_102114
20251024_102025
20251024_102634
previous arrow
next arrow

Filed Under: sivarajan home build

Week 18: Framing & Block Wall cont.

October 19, 2025 by sivarajan home

Framing and block wall are continuing. Truss specs have gone to the engineer for certification.

20251017_101523
20251017_101447
20251017_102329
20251017_101725
previous arrow
next arrow

Filed Under: sivarajan home build

Week 17 – Framing & Block Wall

October 11, 2025 by sivarajan home

Framing continues and the front CMU is being built and first section should be ready for inspection on Monday.

20251009_090053
20251009_090139
20251009_085750 (1)
previous arrow
next arrow

Filed Under: sivarajan home build

  • « Go to Previous Page
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Go to Next Page »

Copyright 2025 - Sivarajan Home