Week 31 – Sealing Walls and Excavating

February 1, 2026 by sivarajan home

This week was about sealing walls (water proofing) and excavation. A LOT of dirt was moved from the front of the house to the garage side and back of the house. Footings will be dug early this next week for the retaining walls needed for the garage and footings should ready to pour by end of week.

20260129_100220
20260129_100424
20260129_100441
20260129_100506
previous arrow
next arrow

Filed Under: sivarajan home build

Week 29-30: Framing | Plumbing | Electrical | Prepping for Garage

January 17, 2026 by sivarajan home

Framing for house is pretty much completed; electrical has started; plumbing has started. The lot has been cleared to prepare for excavation for garage which needs to happen to accommodate the walls to contain the garage area and for the garage footings. This week electrical and plumbing will continue and walls will be sealed -waterproofed- so dirt for garage pad can be adjusted accordingly. Excavation for garage is being scheduled for this week or next.

20260116_072910
20260116_073826
20260116_073053
20260116_073035
20260116_072809
previous arrow
next arrow

Filed Under: sivarajan home build

Week 28 – Block Walls Completed

December 30, 2025 by sivarajan home

Block walls for the house have been completed and passsed inspection and are ready for grouting. Grouting will allow for the final framing to be completed within the next few weeks. Schedule will partially depend on who takes how long off for New Years. Have a Happy New Year : )

20251226_114910
20251226_114832
20251226_114857
20251226_114835
previous arrow
next arrow

Filed Under: sivarajan home build

Week 26-27 – Still More Framing

December 21, 2025 by sivarajan home

Framing and block work continues and almost complete. Electricians have started on the lower floor. Next up windows, more block work for driveway and backfill.

20251218_095548
20251218_095914
20251218_100502
20251218_100523
20251218_100628
previous arrow
next arrow
20251218_100920
20251218_100735
20251218_100819
previous arrow
next arrow

Filed Under: sivarajan home build

Week 25 – Framing, Framing, Framing

December 6, 2025 by sivarajan home

Framing, framing, and more framing. Plus some clean-up.

20251205_080343
20251205_080959
20251205_080514
20251205_080627 (1)
20251205_080800
20251205_080723
previous arrow
next arrow

Filed Under: sivarajan home build

Week 24 – Trusses Almost Completed

November 29, 2025 by sivarajan home

Trusses arrived on Wednesday and by Friday were almost completed. Should be totally completed by early next week. Staircases from lower floor to upper floor have also been added.

20251128_093412
20251128_093619
20251128_093656
20251128_094045
20251128_094347
previous arrow
next arrow

Filed Under: sivarajan home build

Week 23 – Ready for Trusses

November 22, 2025 by sivarajan home

This week’s post deserved two posts; one for the overall construction and one for the views. The views are gorgeous and are from just about every room. Framing is ready for trusses and trusses are scheduled to be delivered the day before Thanksgiving.

20251120_091705
20251120_091745
20251120_091826
20251120_092138
20251120_091614
20251120_091536
previous arrow
next arrow

Here are some of the views from the upstairs level. Unlike the above slideshow, this set of photos is not on auto scroll so you can just click the arrow to scroll through the images.

20251120_092504
20251120_092531
20251120_092609
20251120_093053
previous arrow
next arrow

Filed Under: sivarajan home build

Week 22 – Second Story Framing

November 16, 2025 by sivarajan home

Second story framing is almost complete and ready for trusses. Trusses should be ready in the next week or 10 days. Rain during this week will slow things down a bit, but the project is moving at a steady pace with no major issues. Dumpster was ordered and lot has been cleaned of excess debris.

20251114_094811
20251114_094136
20251114_094201
20251114_094301
20251114_094344
previous arrow
next arrow

Filed Under: sivarajan home build